Material | Aluminum |
Finish | Polyester Powdercoat |
Color | Blue |
Mounts to | Wall |
Shape | Rectangle |
Mount Height | |
Reach | |
Product Dimensions | 36 x 15 x 4 inches |
Box Dimensions | 40 x 17 x 6 inches |
Box Weight | 27 lb |
Country of Origin | United States of America |
We can help you design a solution for your devices, free of charge, within 48 hours.
WIRING & INSTALLATION INSTRUCTIONS
Lights:
The lighting functionality is pre-programmed with optional presets.
The top strobe lights (brick lights) are on all the time but strobe when activated. The rate is adjustable on the circuit board.
The vertical lighting (light strips) is off until the photocell senses dusk/dark and activates white ambient light. Photocell sensitivity and intensity is adjustable on the circuit board.
The vertical lighting also strobes red and blue (alternatively red and yellow) in unison with the brick lights when activated. Duration is adjustable (1 to 20 minutes) on the circuit board.
If a different functionality is required we can custom program the controller with extra lead time and an additional cost.
Wiring:
The wiring into the tower should be performed by someone local that knows the codes. Running conduit into the bottom of the tower and terminating with an outdoor receptacle box is probably the most straightforward. The lighting system is 12 VDC which is powered by a 60 W 120 VAC power supply. It has a 3-prong plug that can be clipped off and hard wired.
The tower draws approximately 50 W and the smaller wall station draws approximately 25 W.
The lighting trigger is a two wire lead that connects to the normally open relay on the intercom.
If you are also planning on integrating Axis cameras then having the 120 VAC power available in the tower is a plus.
Concrete & Anchors:
The concrete should be designed by someone local that can ensure it follows code, but we recommend 32” deep and 32” diameter minimum. The small concrete anchor (Fast Foundation, pn 66TOW-EMER-02-304) is placed and leveled in wet concrete (along with conduit, etc.) Allow a few days to cure, then the tower can be placed.
The large ground anchor (Fast Foundation, pn 66TOW-EMER-01-304) is placed and leveled in an open hole (36" deep and 36" diameter) with packed ground and/or gravel (along with conduit, etc.) Backfill the hole with packed dirt/gravel fill. The tower can be placed immediately.
There is a generous hole in the bottom of the tower for conduits and such.
Everything you need to get your 156STA-VIKI-01-ALU installed.
Similar products that may offer just what you're looking for.